我校欧洲杯押注官网丁丽萍老师在T1级别期刊——《Energy》上发表题为“Do operation and maintenance contracts help photovoltaic poverty alleviation power stations perform better?”。论文作者丁丽萍为欧洲杯押注官网副教授。
Abstract / 摘要:
Photovoltaic poverty alleviation power stations (PPAPS) are the foundation of poverty alleviation, whose operation and maintenance (O&M) status is the key to ensuring long-term poverty reduction advantages. As part of PPAPS′ O&M performance, the role of the O&M contracts has yet to be proven. This paper uses a three-stage data envelopment analysis (DEA) model and grey relation analysis (GRA) to analyze the O&M performance efficiency of PPAPS and the influencing factors of contract governance from field data of 110 counties in Henan Province, China. The results show that:1) the O&M efficiency of the PPAPS is relatively high and inconsistent across the region, which has not yet attained optimal productivity; 2) the present efficiency is mainly determined by the initial investment size and installed capacity; 3) the governance factors of O&M contracts affect the performance efficiency of PPAPS, which may lead to overestimation; and 4) longer contract term and higher performance incentive coefficients may result in inefficiencies at the initial stage of PPAPS′ use, while government subsidies allocation and timely O&M cost settlement have little impact on O&M efficiency. This paper proposes corresponding policy recommendations finally.
论文信息;
Title/题目:
Do operation and maintenance contracts help photovoltaic poverty alleviation power stations perform better?
Authors/作者:
Zhang Zumeng; Ding Liping; Wang Chaofan; Dai Qiyao; Shi Yin; Zhao Yujia; Zhu Yuxuan
Keywords /关键词
Photovoltaic poverty alleviation power stations (PPAPS); Operation and maintenance contract governance; Three-stage DEA; Grey relational coefficient; Performance efficiency
Indexed by /核心评价
SCI; Scopus; AHCI; EI; WAJCI; INSPEC; SCIE;
Highlights /研究要点
• This paper focuses on the true O&M performance efficiency of PPAPS and influencing factors of contractual.;
• PPAPS′ O&M performance efficiency is relatively high with regional differences among counties.;
• The initial investment and capacity installed mostly determined the present efficiency.;
• Longer O&M contract terms and a higher achievements drive will result in inefficiency at the initial stage of PPAPS.
DOI: 10.1016/J.ENERGY.2022.124990
全文链接:https://linkinghub.elsevier.com/retrieve/pii/S0360544222018886